Your Flooring Roadmap
Follow our proven 12-step process — every detail covered so your floor is flawless, start to finish.
Map your rooms, choose the right flooring, and get the site ready.
Decide which rooms need flooring — living, bedrooms, kitchen. Note moisture-prone areas and high-traffic zones.
Pick based on usage: engineered/laminate for living & bedrooms, SPC/vinyl for kitchens & baths, decking for outdoors. Patterns: Straight, Herringbone, Chevron, Diagonal, Parquet.
Lock in shade, thickness (8/10/12mm), skirting, profiles, and underlayment type.
We review your selections and give you a confirmed specification sheet — no surprises later.
Complete all painting, electrical, plumbing & woodwork. Ensure floor is level, clean, and dry — the #1 factor for a flawless install.
We bring samples to you, measure precisely, and lock in your order.
🛈 Already renovating? Skip to Step 6 if your site is ready.
See & feel physical samples under your room's lighting. Compare 2–3 shortlisted options against your walls and furniture.
Walk through every room with the chosen sample. Confirm the exact colour code, thickness, and finish.
We visit for precise room-by-room measurement. Door clearances and subfloor condition checked for an accurate quote.
Detailed quote with materials, installation, accessories, and taxes. No hidden costs — everything is itemised.
We order, QC, and schedule. You confirm the site is cleared, clean, and dry — ready for installation.
Our team lays your floor, and we set you up for years of enjoyment.
Our in-house team installs your floor: underlayment, planks in your chosen pattern, skirting & profiles. Expansion gaps maintained. Final clean-up included. Floor ready to use immediately — 2–5 days.
Walkthrough inspection, care guide, warranty activation (10–25 yr product + 1 yr service), and lifetime support. Use felt pads, sweep regularly, clean spills promptly.
At a Glance
Planning & Selection
Steps 1–4: Rooms mapped, type & specs chosen, expert-approved.
Pre-Interior Work
Step 5: Painting, ceiling & woodwork done. Site leveled and cleaned.
Samples, Measure & Order
Steps 6–9: Samples reviewed, colour locked, site measured, order placed.
Prep & Material Ready
Step 10: Materials QC'd and scheduled. Site confirmed ready.
Install & Enjoy
Steps 11–12: Floor laid in 2–5 days. Walkthrough, warranty, lifetime support.